Scrum configuration associated with a module methodology (sprint duration, point scale, concurrent sprints)
Data model
Fields
| Field | Type | Description |
|---|---|---|
| auto_close_sprint* | BIT | Indicates whether the sprint automatically closes when it reaches its end date |
| concurrent_sprints* | INT | Number of concurrent sprints allowed per project |
| is_active* | BIT | Logical Deletion: 1 = Active Record, 0 = Retired |
| max_story_points* | INT | Maximum story points allowed per work item |
| methodology_id* | UNIQUEIDENTIFIER | Methodology to which the configuration belongs |
| scrum_config_id* | UNIQUEIDENTIFIER | Unique identifier of the Scrum configuration |
| sprint_duration_days* | INT | Sprint duration in days (between 2 and 30) |
| story_point_scale* | VARCHAR (50) | Story point scale used (e.g. Fibonacci) |
| validate_capacity* | BIT | Indicates whether capacity is validated before planning the sprint |
Primary Key
| PK_APMO_SCRUM_CONFIG |
|---|
| scrum_config_id |
References
| Column | Referenced Table | Referenced column | Name |
|---|---|---|---|
| methodology_id* | dbo.APMO_METHODOLOGY | methodology_id | FK01_APMO_SCRUM_CONFIG |