EN
Español
English
Português
    Fix for the execution of deferred rules

    CASE PM-152100-19-202662:

    Previously, when several rules were scheduled to be executed at different times, an error occurred: the first rule was executed correctly, but the following ones accumulated and the second was only executed when the third one met the condition, generating inconsistencies in the flow.

    An adjustment is implemented in the execution logic of deferred rules, ensuring that each rule is executed at the scheduled time according to its specific conditions, avoiding accumulations and ensuring the correct execution sequence.